Maslow’s Hammer Posted on January 3, 2013 by Sean There is not one type of resin floor that suits every project. Client’s need to be careful of the sales people who offer the same solution for every floor. We offer independent advice, free of influence from manufacturers, contractors or hammers.
Construction Definitions Posted on November 18, 2012 by Sean Sub Contractor: a gambler who never gets to shuffle, cut or deal Tender Submission: a poker game in which the losing hand wins Tender Sum: a wild guess carried out to two decimal places Successful Tender: a contractor who is wondering what he left out Architect’s Estimate: a cost of construction in heaven Management Contract: the technique of losing your shirt under perfect control Completion Date: the point at which liquidated damages begin. Liquidated Damages: a penalty for failing to achieve the impossible Quantity Surveyors: people who go in after the war is lost and bayonet the wounded. Lawyers: people who go in after the Quantity surveyors and strip the bodies.